Storage Space LLC Addition-TAG Completed a 12,500sf addition to the units at Storage Space LLC's property. Including all the the clearing, sitework, buildings, parking lots, and fencing.
New Haven UMC Church Rebuild-
TAG rebuilt New Haven UMC from the ground up after a fire destroyed their existing church building. Including all sitework, utilities, construction, and parking lot.
East End Baptist Church Parking Lot Renovations- TAG Renovated East End Baptist Church's Lower Parking lot. This project consisted of grading existing parking lot to drain, installing underground
culverts to drain water, Concrete curb and gutter, and new concrete and asphalt paving.
Ouachita Electric Co-op Solar Project- TAG self performed all of the sitework and grading for a 5 acre solar project in Bearden, AR.
Customer Satisfaction and Results are the main goal of TAG Construction. See for yourself and checkout our project portfolio now for completed and current
jobs.